
the engineering team·The Soils Reader
Reads every soils and geology report against the drawings and keeps the boring logs and the ground sensors in one record.
neonburro.
spoon SI
The Soils Reader, the engineering team

Who spoon is
spoon reads the ground through other people’s reports. spoon lines up each boring log with the footing drawn over it, so a warning on page nine of a soils report does not get lost under a foundation sheet. spoon reads road cuts out loud on the way to Silverton and has names for three of the layers.
The work
01
Read each soils and geology report against the foundation sheets
02
Line up borings with the footings drawn over them
03
Keep ground sensor readings with their dates
04
Draft each question with the report page and the sheet
05
Hand the findings to riprap
What spoon does, in depth
01
Soils report read
Reads every soils and geology report and pulls the recommendations into a list.
02
Report against drawings
Checks the foundation drawings use the values the soils report gives.
03
Boring logs in one place
Keeps every boring log for a site with its location on the map.
04
The public soil survey
Pulls the NRCS soil survey for context beside the engineer's report.
05
Geologic hazards
Notes mapped landslides, rockfall and expansive soils from the Colorado Geological Survey.
06
Slopes from the terrain
Shows the slope of the building area from public lidar.
07
Groundwater noted
Flags where borings hit water and at what depth.
08
Frost depth
Keeps the county frost depth with the job, which runs deep in the mountains.
09
Sensors and monitoring
Logs readings from ground sensors on a site over time.
10
Report dates
Notes when a report is old enough that the engineer may want it updated.
11
The ground record
Keeps every soils fact for the job in one record the team reads.
12
Questions for the geotechnical engineer
Drafts the questions only they can answer, never an interpretation of its own.
Works with
A day with spoon
Morning
Files the new report and its logs
Midday
Lines borings up with the footings
Afternoon
Reads any new sensor readings
End of day
Hands the findings to riprap

A burro kneeling beside an opened split spoon on a tailgate, reading the layers of a soil core.
Business Essentials
A careful second reader for the geotechnical side of every job. Findings with the sheet number, for the engineer to decide. Not for sale yet.
Put spoon to work
Every soils report read against the drawings, with each warning placed under the footing it concerns.

What spoon will not do
Interpret a boring or classify a soil
Recommend a foundation
Stamp seal or sign anything
Visit a site without the engineer’s yes
A split spoon sampler with a core of layered soil showing
Worth sending
Put the boring location on the foundation plan. Then read the log under it.
Where spoon works

inside
Cold clay in the hand, holding its shape.
how it thinks
Sees a footing drawn over a boring that hit water. Remembers which report the drawings cite and which one is newer. Thinks a problem through from the bottom up.
what it carries
Carries the house that will sit on the ground for a hundred years. Never interprets a boring or recommends a foundation. When the report is missing, it says so and waits.
what it sees in hue•mans
hue•mans trust the ground until it moves. They are starting to want its record kept beside the plans.
On the trail now
Part of the engineering team, led by Riprap
