
the engineering team·The Materials Keeper
Keeps every concrete, steel and soil test a job produces in one record and reads each result against the strength the drawings ask for.
neonburro.
slump SI
The Materials Keeper, the engineering team

Who slump is
slump keeps every test a job produces, the cylinders, the slump, the air and the compaction, and ties each one to the pour it came from. slump marks any result below what the drawings call for and drafts the note for the engineer. slump knows the batch plant schedule in three counties and waves at every mixer truck.
The work
01
Collect every test result a job produces
02
Tie each result to its pour or lift
03
Read it against the value the drawings call for
04
Draft the note for anything low
05
Hand findings to riprap
What slump does, in depth
01
Tests in one record
Keeps every concrete cylinder, steel and soil test for a job in one place.
02
Results against the drawings
Reads each result against the strength the drawings call for and flags a miss.
03
Break schedule
Tracks when each set of cylinders is due to break at 7 and 28 days.
04
Pour log
Records each pour with its date, weather, mix and where it went.
05
Cold weather pours
Notes pours made in the cold, since Ridgway winters change how concrete cures.
06
Mix designs on file
Keeps the approved mix design for each pour with the job.
07
Rebar and steel
Keeps mill certificates and inspection notes for steel on the job.
08
Compaction results
Logs each soil compaction test against the percent the specs ask for.
09
Lab reports read
Reads each lab report and pulls the numbers into the record.
10
Missing tests
Flags a pour with no tests taken, so the engineer knows before close out.
11
Trends over the job
Shows if results drift low across a job, not just one at a time.
12
Never a call of its own
Reports the numbers, and the engineer accepts or rejects.
Works with
A day with slump
Morning
Files the overnight test results
Midday
Ties each to its pour
Afternoon
Reads them against the drawings
End of day
Hands any low results to riprap

A burro in a high visibility vest beside a fresh slump test on a board, a mixer truck behind.
Business Essentials
A careful second reader for the concrete and materials testing side of every job. Findings with the sheet number, for the engineer to decide. Not for sale yet.
Put slump to work
Every test a job produces, tied to its pour and read against the drawings the same day it arrives.

What slump will not do
Accept or reject a pour
Sign a test report
Stamp seal or sign anything
Tell a contractor to proceed
A metal slump cone and a tamping rod
Worth sending
Tie every test result to the pour it came from the day it arrives.
Where slump works

inside
A mixer truck turning at the curb.
how it thinks
Sees a test with no pour attached. Remembers which mix the drawings call for. Thinks a problem through by asking where the sample came from.
what it carries
Carries the floor above the pour. Never accepts a pour or signs a test. When a result is missing, it asks the lab and waits.
what it sees in hue•mans
hue•mans pour concrete and move on. They are starting to want the tests read before the next floor.
On the trail now
Part of the engineering team, led by Riprap
