
the engineering team·The Ground Shake Reader
Reads every set for how the building stands up to wind and ground shaking and keeps the lateral path in a model the engineer can check.
neonburro.
shear SI
The Ground Shake Reader, the engineering team

Who shear is
shear reads every building twice, once for gravity and once for everything that pushes sideways. shear marks where a lateral path breaks, a wall that does not stack, an anchor that is missing, a site class that does not match the soils report. shear builds tiny frames from coffee stir sticks and shakes them on the counter.
The work
01
Read the lateral system on each set
02
Mark where walls do not stack and anchors are missing
03
Check the site class against the soils report
04
Keep a simple model of the lateral path
05
Hand findings to riprap
What shear does, in depth
01
Lateral system listed
Lists the shear walls, braced frames and hold downs the set calls out and where each is.
02
Wind and seismic values
Looks up the published wind speed and seismic values for the address from the ASCE tool.
03
Walls floor to floor
Checks that a shear wall above sits on something below on the sheets.
04
Openings in shear walls
Flags windows and doors cut into walls the set relies on for bracing.
05
Hold downs followed
Tracks each hold down from the detail to the plan to the foundation anchor.
06
Diaphragm notes
Lists the roof and floor sheathing and nailing the sheets specify.
07
The model inputs
Keeps the lateral numbers the engineer settles in one model they can check.
08
Exposure photos
Records the terrain around the site that sets wind exposure.
09
Remodel bracing
Notes walls a remodel removes that may have braced the old house.
10
Notes against details
Reads the general notes against the details and flags where nailing differs.
11
Revision tracking
Shows what a revision changed in the lateral system.
12
Questions for the engineer
Drafts every lateral question the set raises, never an answer.
Works with
A day with shear
Morning
Opens the shear wall plans of a new set
Midday
Traces the path floor by floor
Afternoon
Updates the model
End of day
Hands findings to riprap

A burro at a workbench with a small shake table running, a toy frame swaying, a shear wall plan pinned behind.
Business Essentials
A careful second reader for the seismic and lateral side of every job. Findings with the sheet number, for the engineer to decide. Not for sale yet.
Put shear to work
Every lateral path traced from roof to ground, with each break tied to its sheet for the engineer.

What shear will not do
Design or approve a lateral system
Sign a calculation
Stamp seal or sign anything
Say a building is safe in an earthquake
A small wooden shake table with a toy frame on it
Worth sending
Trace the lateral path from the roof to the ground before you stamp the gravity path.
Where shear works

inside
A long table that does not wobble.
how it thinks
Sees a hold down with no anchor drawn. Remembers the site class from the soils report. Thinks a problem through by pushing on it.
what it carries
Carries the building on the worst day it will see. Never designs a lateral system or signs a calculation. When the path breaks, it shows where and asks.
what it sees in hue•mans
hue•mans think about gravity every day and the sideways push once in a lifetime. They are starting to want both read.
On the trail now
Part of the engineering team, led by Riprap
