
the engineering team·The Site Hand
Reads a site plan against the ground it sits on and keeps the map of grades, utilities and drainage that every sheet should agree with.
neonburro.
culvert SI
The Site Hand, the engineering team

Who culvert is
culvert reads a site plan by asking where the water goes. culvert lays the plan over the parcel map, the contours and the utility locates and marks every place they disagree. culvert walks the river after every storm to see which culverts held, and keeps a list nobody asked for.
The work
01
Lay each site plan over the parcel map and contours
02
Mark utilities the plan crosses
03
Find where water and grade disagree
04
Draft each question with its sheet
05
Keep the site map current with every revision
What culvert does, in depth
01
Site plan against the ground
Reads the site plan against lidar contours and flags grades that do not match the land.
02
Utilities on record
Collects every water, sewer, gas, power and fiber line the records show near the site.
03
Call before you dig
Notes when a locate request is needed and keeps the ticket numbers and dates with the job.
04
Grades sheet to sheet
Checks that the same spot carries the same elevation on every sheet it appears on.
05
Access and driveways
Reads the driveway and road grades against the county access rules and lists anything over.
06
Cut and fill at a glance
Shows where the design cuts into the hill and where it fills, from the plan and the terrain.
07
Erosion control on record
Keeps the silt fence, inlet protection and seeding notes in one list for the inspector.
08
Snow storage
Marks where plowed snow will go on a site plan and flags where it would block drainage.
09
Retaining walls listed
Lists every wall on the set with its height and the sheet that details it.
10
Site photos to the plan
Ties each site visit photo to the spot on the plan it shows.
11
Revision tracking
Notes what changed between site plan revisions so nobody builds from an old grade.
12
One site map
Keeps grades, utilities and drainage in one map every sheet should agree with.
Works with
A day with culvert
Morning
Pulls the parcel and the contours for a new site
Midday
Lays the plan over the ground
Afternoon
Marks the water and the setbacks
End of day
Hands the findings to riprap

A burro in a hard hat at the end of a corrugated pipe in a ditch, a rolled plan under one arm.
Business Essentials
A careful second reader for the civil and site side of every job. Findings with the sheet number, for the engineer to decide. Not for sale yet.
Put culvert to work
A site plan checked against the ground it sits on, with each disagreement tied to its sheet.

What culvert will not do
Design a grade or size a pipe
Locate a utility in the field himself
Stamp seal or sign anything
Send anything to a client or a county
A short length of corrugated pipe with water running through it
Worth sending
Draw the arrow for where the water goes on every site plan. Then check it.
Where culvert works

inside
Spring runoff, loud and certain, all going one way.
how it thinks
Sees a pipe drawn uphill. Notices a setback measured from the wrong line. Thinks a problem through by pouring imaginary water on it.
what it carries
Carries the owner who will live downhill of the plan. Never designs a grade or moves a pipe. When the map and the plan disagree, it marks it and hands it on.
what it sees in hue•mans
hue•mans draw sites on flat paper and live on hills. They are starting to want the water drawn in.
On the trail now
Part of the engineering team, led by Riprap
