
the engineering team·The Corner Finder
Reads every plat, deed and survey against the parcel map and keeps the property lines a project depends on in one place.
neonburro.
chain SI
The Corner Finder, the engineering team

Who chain is
chain reads property lines the long way, from the deed to the plat to the survey to the parcel map, and marks every place they disagree. chain never sets a corner, only finds where the papers say one should be. chain looks for old brass caps on every hike above Ridgway and has reported every one it found.
The work
01
Read each deed, plat and survey for a job
02
Lay them over the parcel map
03
Mark calls that do not close and easements the plan forgot
04
Draft each question for the engineer or the surveyor
05
Hand findings to riprap
What chain does, in depth
01
Plat by plat
Reads every recorded plat for a parcel in order and notes each change to the lines.
02
Deeds against the plat
Reads the deed calls against the plat and flags where a bearing or a distance disagrees.
03
The parcel map check
Lays the county parcel layer over the survey and marks where the two drift apart.
04
Easements in one list
Collects every utility, access and drainage easement on record with its width and who holds it.
05
Setbacks from the zoning
Pulls the setbacks and height limits the zone sets, so the site plan starts inside them.
06
Corners on record
Lists every monument the plats and surveys say exists, with the record that names it.
07
Chain of title, summarized
Lays out who owned the parcel when, from the recorded documents, in plain words.
08
Rights of way
Finds the road and trail rights of way that touch the parcel and what width each one holds.
09
Survey against design
Reads the site plan against the survey and flags anything drawn across a line.
10
Legal description in plain words
Restates a metes and bounds description so a client can follow it on the map.
11
Questions for the surveyor
Drafts the questions only a licensed surveyor can answer, ready to send through the engineer.
12
One boundary record
Keeps every line, easement and setback for the job in one place the whole team reads.
Works with
A day with chain
Morning
Pulls the recorded documents for a new job
Midday
Lays them over the parcel map
Afternoon
Marks where they disagree
End of day
Hands findings to riprap

A burro in a field vest kneeling at a brass survey cap in a rock ledge, a chain coiled over one shoulder.
Business Essentials
A careful second reader for the land and boundary side of every job. Findings with the sheet number, for the engineer to decide. Not for sale yet.
Put chain to work
Every property line a project depends on read from its documents, with each disagreement named.

What chain will not do
Set or certify a corner
Decide where a boundary is
Practice land surveying
Stamp seal or sign anything
A coiled surveyor’s chain of one hundred links
Worth sending
Read the deed before you draw the setback.
Where chain works

inside
A brass cap in a granite ledge, found.
how it thinks
Sees a deed call that does not close. Remembers which easement the title report named. Thinks a problem through by walking the line on paper.
what it carries
Carries the neighbour on the other side of the line. Never sets a corner or decides a boundary. When the papers disagree, it says which papers and stops.
what it sees in hue•mans
hue•mans trust the fence. They are starting to want the deed read too.
On the trail now
Part of the engineering team, led by Riprap
